Home Live NITs Future NITs Archive My NITs Award Details E-Tenders About SubVendor FAQ/Help Integrity Pact Fraud Policy Fraud Policy
  TAKE INTEGRITY e-PLEDGE

Search by NIT No.
October 24, 2020 8:18:57 AM IST
Member Login
Total Live NITs are :: 729
*Click on the Contract Classifications to view the Summary
Global NIT = Global NIT, Corrigendum = NIT with Corrigendum, Archived NIT = Archived NIT, Salient Technical Features = Salient Technical Features Bid Document = Bid Document

Result Page > 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146

  Source of NIT NIT Number Document
Sale Close
Date
Contract
Classifications*
Description
  Auraiya (Uttar Pradesh) NTPC/SSC-NR(Auraiya)/9900209062 26/10/2020   Work Contract Design, Engineering, manufacturing, supply, Retrofitting, Erection and commissioning of new Generator Excitation system at NTPC Auraiya.
  Simhadri (Andhra Pradesh) 9900208774 21/10/2020   Equipment Supply & Erection SUPPLY,TESTING ERECTION & COMMISSIONING OF STATION TRANSFORMER FOR RAMAGUNDAM AND SUPPLY OF UAT FOR KUDGI.
  Simhadri (Andhra Pradesh) 9900208719 19/10/2020   Work Contract Procurement of High Masts for NTPC Kudgi.
  Simhadri (Andhra Pradesh) 9900207495 19/10/2020   Work Contract Procurement of LT Power & Control Cables for NTPC Kudgi & Ramagundam.
  Auraiya (Uttar Pradesh) NTPC/SSC-NR(Auraiya)/9900209723 19/10/2020   Work Contract Loading & transportation of pond ash/ bottom ash from NTPC-Unchahar Arkha Ash Dyke and unloading at road construction site of NH-24, 4-Lane bypass starting from Km. 479.500 of NH-24 and terminating at Km. 17.600 of MDR -77C (bypass chainage from Km. 64.900/64.380 to Km. 79.516/79.000 total length 14.618 Km. Pkg-3A) in the State of Uttar Pradesh under NHDP phase-VII on EPC mode.
PREVIOUS PAGEPREVIOUS NEXTNEXT PAGE

Result Page > 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146

Global NIT = Global NIT, Corrigendum = NIT with Corrigendum, Archived NIT = Archived NIT, Salient Technical Features = Salient Technical Features Bid Document = Bid Document

Sitemap | Feedback | Disclaimer
Designed & Maintained by
PECS